HS2 Construction Works Wendover

A temporary bridge used to divert traffic from Ellesborough Road during the construction of the HS2 high-speed rail link is pictured on 17th April 2024 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut-and-cover tunnel, will run alongside the centre of Wendover. Construction of the first leg of HS2 began in September 2020 but high-speed trains are not expected to run on the line until at least 2029. (photo by Mark Kerrison/In Pictures via Getty Images)
A temporary bridge used to divert traffic from Ellesborough Road during the construction of the HS2 high-speed rail link is pictured on 17th April 2024 in Wendover, United Kingdom. The Wendover Green tunnel, a 1185m cut-and-cover tunnel, will run alongside the centre of Wendover. Construction of the first leg of HS2 began in September 2020 but high-speed trains are not expected to run on the line until at least 2029. (photo by Mark Kerrison/In Pictures via Getty Images)
HS2 Construction Works Wendover
EINE LIZENZ KAUFEN
Wie darf ich dieses Bild verwenden?
335,00 €
EUR

DETAILS

Einschränkungen:
Bei kommerzieller Verwendung sowie für verkaufsfördernde Zwecke kontaktieren Sie bitte Ihr lokales Büro.
Bildnachweis:
Mark Kerrison / Kontributor
Redaktionell #:
2147905459
Kollektion:
In Pictures
Erstellt am:
17. April 2024
Hochgeladen am:
Lizenztyp:
Releaseangaben:
Kein Release verfügbar. Weitere Informationen
Quelle:
In Pictures
Objektname:
MK-20240417-HS2-construction-works-Wendover-0006
Max. Dateigröße:
5049 x 3366 px (42,75 x 28,50 cm) - 300 dpi - 10 MB